Editorial Date · 2026-08-04

A conversation about a new website might contain an approved budget, three page ideas, and a date mentioned casually. Before continuing, ask NEO to identify the passages that truly define the project's direction. You will obtain a draft to revise before transforming it into a plan.

Moving from the exchange to a project sheet

Review the elements of the Workshop Site project. Provide me with the decisions and their source, then three next actions with a responsible party. Indicate the dates to be confirmed.

Resuming work after a break

At the next meeting, state the project name and ask for the most recent decision on a specific point. If the context found is incomplete, attach the worksheet. Update the document as soon as a deadline changes.

Case study with a workshop website

During a kickoff discussion, the client approves a homepage and a form. A gallery is included in a previous suggestion, and the budget changed during the call. Attach your notes and request three separate sections: the approved scope, the replaced decisions, and the open questions. The gallery remains in the questions section until the client confirms its role.

Test the record upon resumption.

Have someone who missed the call open the document. This person should be able to explain what is approved and find the first action. If they take an idea for a commitment, add a status column and a reference. Then ask NEO for a review limited to the modified decision. Compare the new record to the previous one before changing the reminder linked to this decision.

See also

Getting approval for a change in scope

A project often progresses through small adjustments that ultimately change its outcome. The client at Atelier Rivage requests a shorter form. Before modifying the form, note which fields will be removed, who used this information, and the expected result after submission. If the "phone number" field becomes optional, the person in charge of quotes must know how to respond to a request that only contains an email address.

Ask NEO to prepare a four-line decision. The first line describes the request. The second explains the proposed change. The third indicates what still needs to be validated. The last line provides an observable test. In this example, the test is to send a request without a phone number and verify that the team can respond based on the information received. Have this decision confirmed before adjusting the document in NeoDoc.

Starting with the current record, prepare the requested change to the form. Quote the relevant decision, note the consequences for quote processing, and provide an acceptance test. Indicate who needs to validate each remaining open point.

Keep a brief record of the previous and new decisions. A NeoAgenda entry can then request "Validate sending without phone number" with the confirmed date and record reference. During the next review, you will be able to distinguish between an idea discussed, a decision made, and a result actually verified. The final check consists of having another person identify these three states using the file.